Haul road construction in mining environments involves heavy equipment operations, material transportation, earthworks, and variable ground conditions, all of which may expose workers to occupational safety hazards. This study aimed to assess the distribution of occupational safety risk levels during the Phase 7B haul road construction project at PT Karya Halim Sampoerna, South Kalimantan, Indonesia, using the Identifikasi Bahaya dan Pengendalian Risiko (IBPR; Hazard Identification and Risk Control) method. A descriptive risk assessment approach was employed, integrating qualitative hazard identification with quantitative risk classification. Eight construction activities were evaluated: subgrade compaction, Dynamic Cone Penetrometer (DCP) testing, base course material supply, base course compaction, sub-base layer material supply, sub-base layer compaction, drainage excavation, and safety berm construction. A total of 81 potential risks were identified and classified into three categories: medium (scores of 5–9), high (10–19), and critical (20–25). No risks were classified as low. High-risk cases accounted for the largest proportion (40 cases; 49.4%), followed by critical-risk cases (30; 37.0%) and medium-risk cases (11; 13.6%). Sub-base layer material supply exhibited the highest proportion of critical risks (10 of 14 cases; 71.4%), followed by base course material supply (6 of 9 cases; 66.7%). These findings highlight the need to prioritize safety assessments and risk control measures related to material transportation, equipment manoeuvring, unloading operations, equipment–worker interactions, excavation conditions, and safety berm design. However, the absence of the original individual hazard register, complete risk-scoring matrix, observation schedule, and post-control risk scores limits the independent reproducibility of the assessment. Consequently, the findings should be interpreted as aggregated risk classifications rather than independently verified risk scores. This study provides an activity-specific framework for prioritizing occupational safety interventions and identifies essential documentation requirements for improving the transparency, reproducibility, and validation of future risk assessments.
Moniri-Morad, A.; Shishvan, M.S.; Aguilar, M.; Goli, M.; Sattarvand, J. (2024). Powered haulage safety, challenges, analysis, and solutions in the mining industry: A comprehensive review. Results in Engineering, 21, 101684. https://doi.org/10.1016/j.rineng.2023.101684
Thoeni, K.; Hartmann, P.; Berglund, T.; Servin, M. (2025). Edge protection along haul roads in mines and quarries: A rigorous study based on full-scale testing and numerical modelling. Journal of Rock Mechanics and Geotechnical Engineering, 17(7), 4020–4035. https://doi.org/10.1016/j.jrmge.2024.10.005
Tripathi, P.; Mittal, Y.K. (2025). Risk assessment and ranking methodology for occupational hazards in construction: A case of Indian high-rise projects. Smart and Sustainable Built Environment, 14(6), 1927–1949. https://doi.org/10.1108/SASBE-06-2024-0219
Vivany, R.A.; Husin, N.A.; Rahardjo, B. (2025). Evaluation of occupational safety and health risks through the hazard identification, risk assessment, and risk control approach in the construction project. Journal Innovation of Civil Engineering, 6(1), 114–130. https://doi.org/10.33474/jice.v6i1.23961
Marliana, W.; Salma, S.A.; Hakim, B.P. (2024). Work accident risk control in road construction projects with the HIRADC approach. Jurnal Indonesia Sosial Teknologi, 5(7), 3290–3304. https://doi.org/10.59141/jist.v5i7.1149
Joshi, H.P.; Adhikari, C.R. (2024). Status of construction safety in local road bridge construction and its consequences in project implementation: A study in Gandaki Province, Nepal. Journal of Engineering Technology and Planning, 5(1), 84–97. https://doi.org/10.3126/joetp.v5i1.69725
Mu’afa, K.; Ariastuti, L.P. (2024). Evaluasi penerapan hazard identification risk assessment and determining control (HIRADC) pada kegiatan hauling di Site X perusahaan pertambangan PT. Z. Archive of Community Health, 11(2), 319–330. https://doi.org/10.24843/ACH.2024.v11.i02.p04
Rembulan, G.D.; Sumakud, C.R.R. (2024). Penerapan program kesehatan dan keselamatan kerja dalam aktivitas kerja coal hauling di PT. XYZ. Journal of Industrial and Manufacture Engineering, 8(2), 134–144. https://doi.org/10.31289/jime.v8i2.11352
Goli, M.; Moniri-Morad, A.; Aguilar, M.; Shishvan, M.S.; Shahsavar, M.; Sattarvand, J. (2025). A simulation-based risk assessment model for comparative analysis of collisions in autonomous and non-autonomous haulage trucks. Applied Sciences, 15(17), 9702. https://doi.org/10.3390/app15179702
Mohandes, S.R.; Karasan, A.; Kutlu Gündoğdu, F.; Singh, A.K.; Mahdiyar, A.; Ghasemi Poor Sabet, P.; et al. (2025). Occupational safety and health risk assessment during maintenance stage of construction projects: A multi-pronged fuzzy-based approach. Expert Systems with Applications, 280, 127522. https://doi.org/10.1016/j.eswa.2025.127522
Yip, H.T.; Tang, Y.M. (2025). A bibliometric study on technology usage for occupational safety and health risk assessment in construction industry. International Journal of Occupational Safety and Ergonomics, 31, 2400–2415. https://doi.org/10.1080/13467581.2025.2499727
Pramanda, R.; Partiwi, S.G.; Sudiarno, A.; Hamdani. (2025). Investigation into the determinants of occupational safety for achieving zero accidents in multi-storey building construction projects: A Bayesian belief network approach. MethodsX, 15, 103508. https://doi.org/10.1016/j.mex.2025.103508
Ahmad, C.; Nugraheni, F.; Faisol. (2024). Development of work safety procedures for PCI girder installation using interactive analysis models. Teknisia, 29(1). https://doi.org/10.20885/teknisia.vol29.iss1.art3
Pramesthi, S.A.; Anwar, R.; Susanti, L. (2025). Risk analysis of occupational safety and health using the HIRARC method at building construction. ASTONJADRO, 14(2), 484–497. https://doi.org/10.32832/astonjadro.v14i2.17359
Azzahra, L.N.; Marlina, S.; Putro, D.S. (2024). K3 risk analysis using the hazard identification risk assessment and risk control method in the Palangka Raya City Roundabout Development Project. Jurnal Teknologi Berkelanjutan, 13(2). https://doi.org/10.20527/jtb.v13i2.287
Rere, L.O.M.A.R.; Khalik, L.O.M.T.; Soeparyanto, T.S.; Nuhun, R.S. (2025). Identifikasi risiko K3 (kesehatan dan keselamatan) kerja pada peningkatan ruas jalan Ululakara-Palangga di Kabupaten Konawe Selatan Provinsi Sulawesi Tenggara. Jurnal Kacapuri: Jurnal Keilmuan Teknik Sipil, 8(2), 257–271. https://doi.org/10.31602/jk.v8i2.19546
Anugrah, R. (2024). Identifikasi dan pengendalian risiko haul road rollingstone di PT Pancaran Surya Abadi Kabupaten Kutai Kartanegara Provinsi Kalimantan Timur. Jurnal Ilmu Pertambangan, 2(2). https://doi.org/10.33096/7v73fm83
Gumanti, S.; Nursani, R. (2026). Analisis kesesuaian parameter geometrik (lebar dan grade) jalan hauling terhadap potensi bahaya kecelakaan pada tambang batubara. Syntax Literate: Jurnal Ilmiah Indonesia, 11(3). https://doi.org/10.36418/syntax-literate.v11i3.64022
Padang, B.G.; Komara, I.; Busri; Novira, A.; Taskin, K. (2026). Operational risk assessment in nickel ore loading, haulage, and stockpile operations: An integrated HIRADC framework based on field observation and critical-control verification. Jurnal Pensil: Pendidikan Teknik Sipil, 15(3). https://doi.org/10.21009/jpensil.v15i3.70398
SUBMITTED: 14 October 2026
ACCEPTED: 28 October 2026
PUBLISHED:
30 October 2026
SUBMITTED to ACCEPTED: 15 days
DOI:
https://doi.org/10.53623/csue.v6i2.1473