Construction waste management is an essential component of sustainable construction, as ineffective handling of residual materials reduces resource efficiency and increases potential environmental burdens. This study evaluates construction waste management practices across 21 building projects in Klaten Regency, Indonesia, based on stakeholder perceptions of four factors: labor, materials, methods, and management. A quantitative descriptive approach was employed using a structured questionnaire comprising 20 initial indicators assessed on a five-point Likert scale. Following item validity testing, 16 indicators were retained for descriptive analysis. The material factor achieved the highest mean score (3.89; good), whereas labor (2.29), methods (2.54), and management (2.47) were classified as poor. The lowest-scoring indicators were the appointment of personnel specifically responsible for waste management (1.62), the inclusion of waste management provisions in contracts (1.76), arrangements for third-party waste disposal (1.86), and the availability of waste sorting facilities (2.05). These findings indicate that conventional material protection and quality control practices are better established than dedicated waste management responsibilities, on-site waste segregation, and contractual governance mechanisms. Recommended improvements include establishing clear responsibilities for waste management, providing designated waste sorting and temporary storage areas, incorporating measurable waste management requirements into construction contracts, and systematically documenting waste generation, handling, and final disposal destinations. Given the limited sample size and reliance on stakeholder perceptions rather than direct measurements of waste generation and disposal, the findings should be interpreted as exploratory evidence from the surveyed projects rather than generalized estimates for all construction projects in Klaten Regency.

Balasbaneh, A.T.; Sher, W.; Li, J.; Ashour, A. (2025). Systematic review of construction waste management scenarios: Informing life cycle sustainability analysis. Circular Economy and Sustainability, 5, 529‒553. https://doi.org/10.1007/s43615-024-00424-z.

Rao, P.A.; Rahman, M.M.; Duraman, S.B. (2025). Adopting circular economy in construction: A review. Frontiers in Built Environment, 11, 1519219. https://doi.org/10.3389/fbuil.2025.1519219.

Gao, Y.; Yiu, T.W.; Shen, X.; Tam, V.W.Y. (2025). Life cycle insights into construction and demolition waste management: Past, present and emerging futures. Journal of Building Engineering, 111, 113441. https://doi.org/10.1016/j.jobe.2025.113441.

Ferriz-Papi, J.A.; Lee, A.; Alhawamdeh, M. (2024). Examining the challenges for circular economy implementation in construction and demolition waste management: A comprehensive review using systematic methods. Buildings, 14, 1237. https://doi.org/10.3390/buildings14051237.

Al Kaabi, M.M.; Abdella, G.M.; Gunduz, M. (2025). Bridging the policy-practice divide: Global systematic mapping of circular economy implementation in construction waste. Frontiers in Built Environment, 11, 1603851. https://doi.org/10.3389/fbuil.2025.1603851.

Min, V.; Panuwatwanich, K.; Matsumoto, K. (2024). Enhancing performance of construction waste management: Factor analysis from the building contractors’ perspectives. Cleaner Waste Systems, 9, 100176. https://doi.org/10.1016/j.clwas.2024.100176.

Wu, H.; Weng, X.; Li, Y.; Liu, S.; Ma, J.; et al. (2025). Critical construction waste minimization strategies for a circular economy in developing countries: A contractor’s perspective in China. International Journal of Environmental Science and Technology, 22, 11211‒11228. https://doi.org/10.1007/s13762-024-06150-1.

Izzati, S.N.; Ardi, R.; Kim, S. (2024). Evaluating drivers and barriers of integrated waste management system implementation in Indonesian construction industry: A DEMATEL-based analytical network process. Sustainability, 16, 2264. https://doi.org/10.3390/su16062264.

Li, K.; Wang, K.; Salleh, H.B.; Chen, Y. (2026). Construction waste governance in China: Policy analysis and roadmap for circular economy transition. Journal of Civil Engineering and Management, 32, 635‒654. https://doi.org/10.3846/jcem.2026.26550.

Pires, M.; Lafayette, K.; Rabbani, E.K.; Claus, R.; Sandes, M.; et al. (2026). Construction waste management and circular economy in urban infrastructure: A systematic literature review and strategic perspectives for emerging economies. Journal of Building Pathology and Rehabilitation, 11, 166. https://doi.org/10.1007/s41024-026-00842-6.

Doan, D.T.; Albsoul, H.; Shobha, A.R.; Ghaffarianhoseini, A.; Ghaffarianhoseini, A. (2026). An integrated challenge–strategy framework for construction waste management in New Zealand: Behavioural and organisational challenges and strategies. Engineering, Construction and Architectural Management, 33, 6206‒6227. https://doi.org/10.1108/ECAM-05-2025-0892.

Mankata, L.M.; Antwi-Afari, P.; Frimpong, S.; Ng, S.T. (2025). Material passports in construction waste management: A systematic review of contexts, stakeholders, requirements, and challenges. Buildings, 15, 1825. https://doi.org/10.3390/buildings15111825.

Fazeli, A.; Mohandes, S.R.; LeNguyen, K.; Banihashemi, S. (2026). Advanced digital solutions for construction waste management: A 4D BIM integrated scenario analysis. Green Technologies and Sustainability, 4, 100318. https://doi.org/10.1016/j.grets.2025.100318.

Tran, N.M.; Bui, P.T.; Le-Hoai, L. (2025). Exploring drivers and barriers to implement construction and demolition waste management system towards sustainability: A case study in Vietnam. Smart and Sustainable Built Environment, 1‒23. https://doi.org/10.1108/SASBE-03-2025-0117.

Min, V.; Panuwatwanich, K.; Matsumoto, K. (2025). Evaluating key attributes for enhancing contractors’ performance in construction waste management: A multi-criteria decision analysis using the Best Worst Method. International Journal of Construction Management, 25, 1968‒1981. https://doi.org/10.1080/15623599.2025.2493882.

Tikam, H.; Kothari, C. (2026). Policy instruments for effective construction and demolition waste management. Engineering, Construction and Architectural Management. https://doi.org/10.1108/ECAM-09-2025-1412.

Zheng, Z.; Su, Y.; Wang, X.; Zhou, Z.; et al. (2024). Developing a construction waste management performance calculator for highway construction. Scientific Reports, 14, 27679. https://doi.org/10.1038/s41598-024-79522-9.

Shahid, M.U.; Ali, M. (2025). Analyzing barriers to construction waste minimization and circular economy culture in building projects using fuzzy DEMATEL. Scientific Reports, 15, 39514. https://doi.org/10.1038/s41598-025-23188-4.

Swarnakar, V.; Khalfan, M. (2024). Circular economy in construction and demolition waste management: An in-depth review and future perspectives in the construction sector. Smart and Sustainable Built Environment. https://doi.org/10.1108/SASBE-02-2024-0056.

Min, J.C.S.; Thing, H.W.; Jing, C.Y.; Mahmud, A.T.; Mohd Fateh, M.A. (2024). Development of procedural framework for 6R implementation in construction waste management. Planning Malaysia, 22. https://doi.org/10.21837/pm.v22i32.1520.

About this article

SUBMITTED: 24 September 2026
ACCEPTED: 27 October 2026
PUBLISHED: 28 October 2026
SUBMITTED to ACCEPTED: 34 days
DOI: https://doi.org/10.53623/csue.v6i2.1439