CV Jeans Gallery is a convection company that faced significant challenges related to waste in its production process, including high waiting times, workload imbalances, and inefficiencies in production flow. The primary aim of this study was to identify and reduce waste through the application of the Value Stream Mapping (VSM) method. VSM was employed to map the production process, identify non-value-added activities, and uncover opportunities for improvement to enhance overall efficiency. Data was collected through direct observation, interviews with employees, and recording the time taken for various production processes. The analysis revealed that several types of waste occurred across the production stages. This included inventory waste, characterized by excessive raw material stock, and waiting waste, particularly during the design of embroidery patterns, where delays were frequently observed. Additionally, defects were identified as another significant form of waste, occurring when products could not be used by customers due to quality issues.
Dewi, D.H.; Sapitri (2024). Study of Time Waste (Waste Time) and Implementation of Value Stream Mapping on Sloof and Column.Scientist Journal, 24, 49‒60. http://doi.org/10.25299/sentis.2024.Vol.24(01).16743.
Ashari, F.; Abryandoko, E.W. (2023). LEAN Service Approach to Reduce Car Service Time Waste Using the Value Stream Mapping (VSM) Method.The World of Knowledge, 7, 157‒167. http://doi.org/10.36805/b.v7i2.5375.
Novitasari, R.; Iftadi, I. (2020). Lean Manufacturing Analysis for Waste Minimization in the Door PU Process.Intech Journal of Industrial Technology, 6, 65‒74. http://doi.org/10.30656/intach.v6I1.2045.
Komariah, I. (2022). The Application of Lean Manufacturing to Identify Waste in Pan Production Using Value Stream Mapping (VSM) at Primajaya Aluminum Industry Company in Ciamis.Media Technology Journal, 8, 109‒118. http://doi.org/10.25157/jmt.v8i2.2668.
Ayu, D.R.; Alfa, B.N. (2023). Reducing Waste with Value Stream Mapping Method in the Process of Providing Medicines & Consumables at DKI Jakarta Health Service Companies.Pasti Journal (Research and Application of Systems and Industrial Technology), 16, 360. http://doi.org/10.22441/pasti.2022.v16I3.010.
Suparno, S.; Susanto, A.S. (2021). Increasing the Productivity of Leaf Spring Type Minicup Type MMS 2230 by Reducing Production Process Waste Through the Application of Lean Manufacturing Method.Industrial Systems Engineering Journal, 10, 89‒100. http://doi.org/10.26593/JRSI.V10I1.3813.89-100.
Alifka, K.P.; Apriliani, F. (2024). Product Quality Control Analysis Using Statistical Process Control (SPC) and Failure Mode and Effect Analysis (FMEA).Factory Journal of Industrial Management and Engineering Systems, 2, 97‒118. http://doi.org/10.56211/factory.v2i3.486.
Prabandari, V.O.P.; Sumarni, S.; Isnantyo, F.D. (2024). Photovoice Analysis of Industrial Practice Experience: A Collaborative Autoethnography Study.Educator's Pencil Journal of Civil Engineering Technology, 13, 342‒355. http://doi.org/10.21009/jpensil.v13i3.44496.
Ravizar, A.; Rosihin, R. (2018). The Application of Lean Manufacturing to Reduce Waste in Absorbent Production.Intech Journal of Industrial Technology, 4, 23. http://doi.org/10.30656/intech.v4i1.854.
Moengin, P.; Ayunda, N. (2021). Lean Manufacturing to Minimize Lead Time and Waste to Achieve Production Targets (Case study: PT. Rollflex Manufacturing Indonesia).Industrial Engineering Journal, 11, 77‒92. http://doi.org/10.25105/JTI.V11.9699.
Vidal-Carreras, P.I.; Garcia-Sabater, J.J.; Marin-Garcia, J.A. (2022). Applying Value Stream Mapping to Improve the Delivery of Patient Care in the Oncology Day Hospital.International Journal of Environmental Research and Public Health, 19, 4265. http://doi.org/10.3390/egerf19074265.
Salsabila, I.R.; Rochmoeljati, R. (2021). Analysis of the Application of Lean Manufacturing Concept in the Stainless Steel Coil Production Process to Reduce Waste at PT. XYZ.Juminten Journal, 2, 120‒131. http://doi.org/10.33005/juminten.v2i2.235.
Ponda, H.; Fatma, N.F.; Siswantoro, I. (2022). Proposal for the Implementation of Lean Manufacturing with the Value Stream Mapping (VSM) Method in Minimizing Waste in the Production Process of Motorcycle Tires in the Tire Manufacturing Industry.Heuristic Journal, 23‒42. http://doi.org/10.30996/heuristic.v19i1.6568.
Diniaty, D. (2018). Determination of the Number of Workers Based on Standard Time by Work Sampling Method at Gearbox Overhaul Repair Station (Case Study: PT. IMECO Inter Sarana).Industrial Engineering Journal of Researcher and Scientific Works in Industrial Technology, 3, 1. http://doi.org/10.24014/JTI.V3I1.5557.
Aftikaningsih, T. (2010). Implementation of Lean Manufacturing to Reduce Cycle Time in the Production Process of Golf Gloves (case study: CV. Human Light).Chemical Engineering Information and Model Journal, 53, 2021. http://doi.org/10.1088/1751-8113/44/8/085201.
Khunaifi, A.; Primadasa, R.; Sutono, S.B. (2022). Implementation of Lean Manufacturing to Minimize Waste Using the Value Stream Mapping Method at PT. Barutama Temple.Industrial Engineering Journal, 4, 87‒93. http://doi.org/10.37631/JRI.V4I2.560.
Rother, M.; Harris, R. (2001). Creating a Sustainable Flow: An Action Guide for Managers, Engineers & Production Associates. Lean Enterprise Institute: Boston, USA.
Maulana, Y. (2019). Waste Identification Using the Value Stream Mapping Method in the Housing Industry.Industrial Engineering and Operations Management Journal, 2, 2934. http://doi.org/10.31602/jieom.v2i2.2934.
Purbasari, A.; Sumarya, E.; Mardhiyah, R. (2023). The Application of the Time and Motion Study Method in the Packing Process at PT. ABC.Sigma Engineering Journal, 6, 290‒299. http://doi.org/10.33373/sigmateknika.v6i2.5633.
Susanti, D.A.; Yulianto, L.; Kurniawan, V.R.B.; Nurhayati, E.; Rezalti, D.T. (2023). Analisis Lean Manufacturing Pendekatan VSM dan FMEA untuk Meminimasi Pemborosan pada Salah Satu Perusahaan Logam di Jawa Tengah. Prosiding Seminar Nasional Teknik Industri (SENASTI), 1, 877–886.
SUBMITTED: 27 March 2025
ACCEPTED: 14 April 2025
PUBLISHED:
19 April 2025
SUBMITTED to ACCEPTED: 19 days
DOI:
https://doi.org/10.53623/idwm.v5i1.643