This study developed an integrated decision support framework that linked gypsum demand forecasting with the Economic Order Quantity (EOQ) and Periodic Order Quantity (POQ) inventory control methods. Historical gypsum consumption data from PT Lafarge Cement Indonesia for 2023–2024, together with ordering costs, holding costs, and replenishment lead times, were analyzed to develop an inventory planning strategy for 2025. Three forecasting methods quadratic, exponential, and cyclical forecasting were evaluated using Mean Absolute Percentage Error (MAPE), and the model with the lowest MAPE was selected to estimate future gypsum demand. The results showed that the selected cyclical forecasting method predicted an annual gypsum demand of 73,167.64 tons for 2025. Under the existing inventory policy, the total inventory cost was Rp6,475,551.63. The EOQ model yielded an optimal order quantity of 6,233 tons and a total inventory cost of Rp5,297,287.41, representing savings of Rp1,178,264.22, or 18.20%. The POQ model resulted in a replenishment interval of approximately 1.02 months, with a safety stock of 15,712.24 tons and a reorder point of 22,475.05 tons. This approach resulted in a total inventory cost of Rp5,239,614.91. Compared with the existing policy, the POQ model provided estimated savings of Rp1,235,936.72, equivalent to a 19.09% reduction in inventory costs. These findings demonstrated that integrating demand forecasting with EOQ and POQ provided a practical approach to improving gypsum inventory planning, reducing inventory costs, and maintaining material availability in cement manufacturing.
Zhang, Y.; Zhang, X.; Yang, X. (2008). Research on effect of limestone and gypsum on C3A, C3S and PC clinker system. Construction and Building Materials, 22, 1634–1642. https://doi.org/10.1016/j.conbuildmat.2007.06.013.
Kim, J.; Lee, J.; Park, H.; Kim, S.; Lee, S. (2023). Nondestructive evaluation for hydration and setting time of gypsum modified calcium sulfoaluminate cement paste. Materials, 16, 920. https://doi.org/10.3390/ma16030920.
Hasan, I.A.; Pulansari, F. (2023). Application of the Min-Max Stock Method in the Inventory Control of the Raw Materials for the Cement Production at PT XYZ. Indonesian Journal of Industrial Engineering & Management, 4, 303–309. https://doi.org/10.22441/ijiem.v4i3.20953.
Wardah, S.; Nurhasanah, N.; Sudarwati, W. (2023). Integration models of demand forecasting and inventory control for coconut sugar using the ARIMA and EOQ modification methods. Jurnal Sistem dan Manajemen Industri, 7, 127–138. https://doi.org/10.30656/jsmi.v7i2.6500.
Aznedra, A.; Safitri, E. (2018). Analisis Pengendalian Internal Persediaan Dan Penerapan Metode Just in Time Terhadap Efisiensi Biaya Persediaan Bahan Baku Studi Kasus Pt. Siix Electronics Indonesia. Measurement: Jurnal Akuntansi, 12, 120. https://doi.org/10.33373/mja.v12i2.1738.
Latifah, N.; Setiawan, A.; Setiaji, P. (2024). Implementation of the JIT (Just in Time) Method in a Responsive Web Based Inventory Management Application at Pandawa 5 Furniture. INSYTECH: Information System and Technology, 1, 1. https://doi.org/10.24176/insytech.v1i1.14286.
Duanaputri, R.; Sulistyowati, S.; Insani, P.A. (2022). Analisis peramalan kebutuhan energi listrik sektor industri di Jawa Timur dengan metode regresi linear. Jurnal Eltek, 20, 50–60. https://doi.org/10.33795/eltek.v20i2.352.
Pratomo, E. (2019). Model ABC Multi-Criteria Inventory Classification (MCIC) Menggunakan Pemrograman Linear Pada Produk Kimia. Jurnal Manajemen Industri dan Logistik, 3, 106–118. https://doi.org/10.30988/jmil.v3i2.242.
Octavieka, Y.A.; Pratama, I.L. (2024). Optimalisasi Pengendalian Persediaan Material Lithos: Studi Perbandingan Metode EOQ dan POQ untuk Efisiensi Biaya. COMSERVA: Jurnal Penelitian dan Pengabdian Masyarakat, 4, 2092–2103. https://doi.org/10.59141/comserva.v4i7.2600.
Alfarizi, R.; Lubis, F.S.; Nazaruddin; Nofirza; Rizki, M. (2024). Pengendalian Persediaan Bahan Baku Rotan Menggunakan Metode EOQ Dan POQ. Jurnal Perangkat Lunak, 6, 54–65. https://doi.org/10.32520/jupel.v6i1.2863.
Sumantika, A.; Sirait, G.; Susanti, E.; Tarigan, E.P.L. (2023). Determination of Economic Value using the EOQ and ROP Approaches in the Raw Material Control System. Formosa Journal of Applied Sciences, 2, 1051–1064. https://doi.org/10.55927/fjas.v2i6.4323.
Iskandar, I.; Ananda, O.M. (2024). Analysis of Control for Primary Raw Material Inventory Using EOQ, POQ, & LFL Methods. Cashflow: Current Advanced Research in Sharia Finance and Economic Worldwide, 3, 347–364. https://doi.org/10.55047/cashflow.v3i2.1083.
Nurmutia, S. (2020). Perencanan Material Produk Sandal Dengan Metode Material Requirement Planning (MIDR). JITMI: Jurnal Ilmiah Teknik dan Manajemen Industri, 3, 59. https://doi.org/10.32493/jitmi.v3i1.y2020.p59-65.
Wahyuni, E.I.; Meutia, S.; Irwansyah, D. (2022). Optimasi Perencanaan Produksi Roti Kacang Dengan Menggunakan Metode Goal Programming Di Ud. Umega Hj Eliya Lubis Kota Tebing Tinggi. Industrial Engineering Journal, 11, 1–7. https://doi.org/10.53912/iej.v11i2.950.
Sari, I.P. (2024). Peramalan Permintaan Produksi Menggunakan Metode Proyeksi Kecenderungan dengan Regresi. InfoTekJar: Jurnal Nasional Informatika dan Teknologi Jaringan, 7, 35–37. https://doi.org/10.30743/infotekjar.v7i2.9529.
Hartono, H.R.P.; Wulansasri, N.E.; Nugroho, S.W. (2024). Analisis Pengendalian Persediaan Pupuk Non Subsidi Dengan Metode EOQ (Economic Order Quantity) Pada Cv Zakky Jaya. JAMER: Jurnal Akuntansi Merdeka, 5, 47–53. https://doi.org/10.33319/jamer.v5i1.116.
Oktavia, S.; Kurnianingtyas, C.D.; Destyanto, T.Y.R. (2024). Omax Application on a T-Shirt SME for Productivity Improvement. SHS Web of Conferences, 189, 01016. https://doi.org/10.1051/shsconf/202418901016.
April, M.D.A.P.; Lubis, F.S.; Hartati, M.; HaIDRito, H.; Taslim, R. (2023). Pengendalian Stok Bahan Utama Pada Produksi Koran Di PT. XYZ Dengan Menggunakan Metode Economic Order Quantity (EOQ) Probabilistic. Jurnal Perangkat Lunak, 5, 385–395. https://doi.org/10.32520/jupel.v5i3.2802.
Azwir, H.H.; Hidayatulloh, A.; Oemar, H. (2021). Implementasi Consignment Stock Dan Marketing Mix Strategy 4P Untuk Menurunkan Persediaan Pada Part and Service Department Di Pt. Coal Mining. Jurnal Manajemen Industri dan Logistik, 5, 93–106. https://doi.org/10.30988/jmil.v5i2.723.
SUBMITTED: 28 July 2026
ACCEPTED: 10 September 2026
PUBLISHED:
12 September 2026
SUBMITTED to ACCEPTED: 44 days
DOI:
https://doi.org/10.53623/idwm.v6i2.1318